Skip directly to: content | left navigation | search

PUBLIC HEALTH ASSESSMENT

PETRO-PROCESSORS OF LOUISIANA INCORPORATE
BATON ROUGE, EAST BATON ROUGE PARISH, LOUISIANA



SUMMARY

The Petro-Processors of Louisiana, Inc. (PPI) site, located in East Baton Rouge Parish, Louisiana, operated two waste disposal facilities: the Brooklawn area and the Scenic Highway area. A variety of wastes generated by petrochemical processes were disposed of at both areas by the operators of the site, from 1964 to 1980. Both areas contain chlorinated aromatic hydrocarbons and chlorinated hydrocarbons. Contaminants have been detected in samples from soil, groundwater, surface water, and air at the Brooklawn area and in soil, groundwater, and air at the Scenic Highway area. Contaminants in water, sediments and fish have been detected off-site of the Brooklawn area, Scenic area, in Bayou Baton Rouge and in Devil's Swamp. In 1993, the Louisiana Department of Environmental Quality (LDEQ) and the Department of Health and Hospitals, Office of Public Health (LOPH), Section of Environmental Epidemiology (SEE) expanded a 1987 health advisory against swimming, sediment contact, and fish consumption to include Devil's Swamp and Bayou Baton Rouge.

The community has expressed concerns about potential health effects related to the site, migration of contamination off site, the potential for increased exposure during remediation, foul smells and respiratory distress, and the lack of an evacuation plan.

An evaluation of the health outcome data did not demonstrate a significant difference in cancer and stillbirth rates between the community of Alsen and East Baton Rouge Parish.

The site is considered a public health hazard because of risks to human health from past, present, and future exposure to hazardous substances. Exposure pathways of public health concern are: ingestion of contaminated fish, potential ingestion of contaminated groundwater and wildlife, dermal contact with contaminated sediments, inhalation of airborne volatile contaminants prior to and during remedial activities, and dermal and incidental ingestion of contaminated soils.

The LOPH and the Agency for Toxic Substances and Disease Registry's (ATSDR) Health Activities Recommendation Panel determined that community and health professional education is needed. In addition, LOPH recommends better site restrictions, additional groundwater characterization, air monitoring during excavation, additional fish sampling, and development of an emergency evacuation plan.

BACKGROUND

A. Site Description and History

Petro-Processors Inc. (PPI), operated two waste disposal facilities between 1964-1980, located north of Baton Rouge, Louisiana. These two waste disposal sites, known as the Scenic Highway area and the Brooklawn area (Appendix A, Figure 1), were used to store various industrial and petrochemical waste products. The two areas are located about one mile apart and cover a total of 62 acres. There are distinct topographic features which characterize both areas. Both areas are located adjacent to Bayou Baton Rouge and are partially within its flood plain. In addition, sections of both sites are elevated, in an upland terrace above the bayous flood plain. Initially, lower portions of the Brooklawn area was located within the eastern edge of the Mississippi River flood plain, about 5000 feet from the river channel. Current containment and remedial activities include; fencing the perimeter of the sites and 24 hour security supervision, incineration of contaminated water, clay capping of some contaminated lagoons, along with air and water monitoring.

The Brooklawn area:

Brooklawn area is located on Brooklawn Drive, about 1.9 miles west of the intersection of U.S. Highway 61 and Brooklawn Drive. Bayou Baton Rouge borders both the north and west sides of the area and flows into Devils Swamp. The Brooklawn area occupies approximately 55 acres and includes three identifiable areas of waste disposal and contamination: (1) the bluff area, (2) the batture area and (3) the Cypress Swamp area, (Appendix A, Figure 2). The batture area contains an upper lagoon and a lower lagoon which are located in the flood plain of the Mississippi River. In June 1983, the Cypress Swamp was flooded by the Mississippi River, and flood waters came within four inches of overtopping the lagoons in the batture area. In order to prevent overflow into Bayou Baton Rouge, the lower lagoon was pumped from February 1 through 6, 1985 and the upper lagoon was pumped from February 27 through March 2, 1985. An old channel of the bayou runs through part of the area and may be a conduit for migration of wastes. Disposal activities at the Brooklawn area began in 1969 and continued until 1980. Initially, wastes were disposed into unlined pits in the bluff area. The upper lagoon was filled and capped with clay in late 1994. The lower lagoon is uncapped to date, and surface water is pumped and treated by incineration. The lower lagoon is scheduled to be capped in 1995.

The Scenic Highway area:

The Scenic Highway area is located on the west side of U.S. Highway 61, south of the bridge over Bayou Baton Rouge (Appendix A, Figure 1). It is approximately seven acres in size and began as a large unlined pit excavated prior to 1964 to supply soil for the construction of a nearby highway. The initial pit was 750 feet long, 450 feet wide and 20-24 feet deep. Waste was disposed of in this area from 1965 to 1969. Highway 61 delineates the eastern area boundary, and Bayou Baton Rouge borders the northern and western boundaries. At one time, waters from the bayou were in direct contact with the highly eroded bluff walls along the western boundary. However, the bayou has been slightly diverted in this area and erosion has been reduced. In 1991, part of Bayou Baton Rouge was diverted to the west away from the eroding bluffs, which were later reinforced. The Scenic Highway area contains an estimated 3.5 million cubic feet of contaminated material, including chemical waste such as organic and volatile compounds and industrial waste such as empty drums, pipe, and plastics. The disposal pit was abandoned in 1968 and uncovered liquid waste was exposed at the surface until 1973. The pit was closed and covered with plastic and soil in 1974. In 1992, the Scenic Highway site was covered with a two inch clay cap.

In response to community concerns, a health survey was conducted on November 17 and 18, 1980 in the Alsen community, southeast of the PPI Site. A team consisting of one physician, one nurse and two public health investigators went to the community center to collect information from people who came voluntarily for the health interviews. Approximately 140 people were interviewed; information was obtained for 107 households representing 367 residents or about 40% of the total population of Alsen. A letter detailing the results of the health survey was submitted to the Director of the Division of Disease Control, State of Louisiana, on November 24, 1980 (Appendix B).

In July of 1980, the U.S. Justice Department and state and local governments jointly filed suit against PPI and several waste generators that used the site for disposal. Since mid-1980, the responsible industries along with regulatory agencies have conducted several investigations at the site. On February 16, 1984, a Consent Decree for site closure was finalized with the participation of all parties and the court. The consent decree specified that the potential responsible parties (PRP), represented by NPC Services Inc., implement a remedial investigation, design a remedial plan and conduct long-term monitoring at the PPI site. It also mandated that NPC Services Inc. conduct an investigative study to verify the accuracy of the existing monitoring systems and to determine the nature, scope, extent, and likelihood of additional contamination at the site. This study, known as the Remedial Planning Activities Report (RPA), was approved in September of 1986. The Remedial Design and Construction Plan (RDCP), prepared by NPC Services, Inc., (NPC), was finalized and approved by the U.S. Environmental Protection Agency (EPA) and the LDEQ in June of 1987.

Remedial actions began in the summer of 1987. During remedial excavation activities, volatile contaminants were released into the air, particularly hexachlorobutadiene (HCBD) emissions exceeded allowable concentrations at the site. As a result, in December 1987, all waste handling activities were stopped. A new remedy for the site was developed (Supplemental Remedial Action Plan (SRAP) which does not involve excavation of the materials, but rather the pumping and treatment of groundwater and liquid waste by incineration. A two inch clay cap was also constructed over the upper lagoon of the Brooklawn site and over the Scenic Highway site.

Currently, there are 27 total on-site monitoring wells, 130 on-site recovery wells and 98 on-site French drains. Of the 27 total monitoring wells, 9 wells each are located at the Brooklawn, Scenic Highway and Vault locations. The recovery wells and French drains recover contaminated groundwater and liquid waste for on-site treatment. In addition, EPA is investigating the extent of contamination in Bayou Baton Rouge and Devil's Swamp.

The Agency for Toxic Substances and Disease Registry (ATSDR) released a Preliminary Public Health Assessment of this site on December 6, 1990. It concluded that the site represented a public health hazard. Potential exposures were found to be inhalation of volatilized contaminants, ingestion of contaminated fish and wildlife, ingestion of contaminated groundwater and dermal contact with surface water and sediments. The preliminary health assessment recommended investigation and monitoring of groundwater, investigation of surface water runoff, biota sampling and air sampling. It also recommended the implementation of measures to prevent site erosion and a demographic review of the surrounding area. A draft was presented for public comment from March 20, 1995 to May 18, 1995.

B. Site Visits

May 3, 1991 Site Visit

On May 3, 1991, health assessors and health educators from LOPH, Section of Environmental Epidemiology, and LDEQ, Inactive and Abandoned Sites Division, conducted a site visit. The site was observed from outside the fence line.

The Brooklawn disposal area is located just south of the Schuylkill metals plant. It is surrounded by a six-foot high chain linked fence that is topped with three strands of barbed wire. Two signs were posted, one identifying the site as hazardous and another sign indicating "No Trespassing." No evidence of contamination was visible from the fence line due to the clay cap. Twelve contaminated groundwater recovery wells were visible. In addition, the site contains nine groundwater monitoring wells, not visible from the fence line. A wastewater treatment plant, used to treat surface water and groundwater before discharge into the bayou, was located near the site. A recovery system consisting of a network of pipes and drains was observed on site and was designed to collect contaminated water. The cypress swamp area was drained and backfilled. At the time of the site visit it was covered with grass. One unlined lagoon was left on site, the lower lagoon at the Brooklawn site. A road was under construction which runs parallel to Bayou Baton Rouge, downstream from the Brooklawn area, and into the upper portions of Devil's Swamp. The road was completed in 1991 to provide access for excavation of contaminated soil from the bottom of the bayou.

There are two industrial facilities directly across Brooklawn Drive from the Brooklawn area (Reynolds Aluminum and Schuylkill Metals) with approximately 200 employees. Just east of the site along Brooklawn Drive are the Kansas City Southern Railroad and the Kaiser Aluminum facilities. Southeast of the site along Scenic Highway is the Rollins Waste Disposal facility. There is an extensive industrial corridor extending to the south along the Mississippi River. The terrain in the area includes elevated bluffs and low lying areas adjacent to Bayou Baton Rouge. It is believed that an old channel of Bayou Baton Rouge runs underneath part of the Brooklawn area.

The Scenic Highway area was a borrow pit at one time, created during the construction of U.S. Highway 61. The unlined pit was used to dispose of hazardous waste between 1965 to 1969. The site is surrounded by a six-foot high barbed wire fence with a locked gate. No evidence of contamination was visible from the fence line because the site is capped. There are houses within 200-300 yards of the site. Surrounding land use includes recreational activities (fishing and hunting) and grazing of livestock. The terrain at the site includes a high bluff and steep banks extending to Bayou Baton Rouge along the site's western edge.

June 15, 1994 Site Visit

On June 15, 1994, health assessors and staff from LOPH and LDEQ were given a tour of the site by NPC representatives to assess current site conditions. Since the site visit in 1991, the Brooklawn area has undergone extensive changes. A very large, empty disposal vault is located approximately 1/4 mile northeast of the Brooklawn area. This vault was originally constructed to dispose of the excavated wastes. It has since become obsolete due to the change in the remediation plans from excavation of contaminated material to hydraulic containment, while pumping and treating fluids from the ground. There have been 98 french drains and 130 recovery wells installed on-site and a total of 27 monitoring wells installed around the site. Nine each of these water monitoring wells are located at the Brooklawn, Scenic Highway, and the Vault sites. An on-site incinerator which will be used for burning organic material was being installed. The upper lagoon has since been filled and topped with a clay cap in late 1994.

At the Scenic Highway area, Bayou Baton Rouge was slightly diverted so that it is not directly adjacent to the western boundary of the disposal area. Also, the slope of the bayou's bank in this area has been graded and stabilized to reduce erosion.

C. Demographics, Land Use, and Natural Resources Use

The Petro-Processors site is located near the community of Alsen, (1990 population 4,178), in East Baton Rouge Parish, (1990 population 380,105). According to 1990 census data, sixty-three percent of the parish population is Caucasian; thirty-seven percent are non-Caucasian. The average annual income for East Baton Rouge Parish is above the average for the state. The number of people in the parish that are considered below poverty level is 19.3%, compared to the yearly average for Louisiana of 18.6%. The largest community in the area of the site is the city of Scotlandville, which is located within three miles of the site. It's 1989 population was 15,113. The city of Baker is located approximately three miles east of the Scenic Highway area and is the second largest community in this vicinity, with a 1989 population of 12,896.

Information available for the Brooklawn area indicates that the population at risk for exposure to site contaminants include the approximately 200 employees who work for the two facilities (Schuylkill and Reynolds) located within 400 yards north of the site. The Louisiana Training Institute (LTI), several schools located in Baker and Alsen, churches and other industries are located within a two-mile radius of the PPI site. The LTI, is a facility for juvenile offenders which houses approximately 280 juveniles. It is located just off the Scenic Highway in Alsen. Also located near the site is the Juvenile Reception and Diagnostic Center, a placement center for the juvenile offenders, which houses approximately 200 juveniles. Southern University Agriculture Department is located off of Scenic Highway in the town of Alsen. During daylight hours, approximately 90 people are present at this facility. Two schools are located in Scotlandville and are within a three-mile radius of the Scenic Highway area. Crestworth Elementary School has an average yearly enrollment of 350 students and Crestworth Middle School which is adjacent to Crestworth Elementary has an average yearly enrollment of 650 students. Both of these schools are located within the Crestworth residential subdivision which has approximately 350 homes. In addition, the community of Alsen has one Head Start school with an average enrollment of 360 children. There are about 50 people in approximately 15 individual residences who live within a one-mile radius of the Scenic Highway area.

The coordinates of the Petro-Processors Inc., site is 30:34:00 north latitude and 91:10:30 west longitude. Demographic statistics for the site included block groups 0041 1, 0042032, and 0042034. These block groups include the site, the city of Alsen and surrounding areas. Figures 6 and 7 (Appendix A), demonstrates the area (boxed area) included in the demographic analysis. The following tables present the demographic information for this area.

Land use in the area includes agricultural and recreational activities such as hunting, fishing, vegetable gardening, animal grazing and farming. At least 20 families within a one-mile radius of the Scenic Highway and Brooklawn areas have vegetable gardens in their yards. Several acres of land adjacent to the Scenic Highway area are used for growing crops. Bayou Baton Rouge is located in this area and is used for recreational water activities including fishing. Several residential wells are in the area, one of which is within a half-mile of the Scenic Highway area. Groundwater use to include city water source, industrial and production wells.

Demographics for the Petro-Processors Inc., Site and Surrounding Area.

BLOCK GROUPS

TOTAL
BLOCK
GROUPS
0041     1 0042032 0042034
TOTAL
POPULATION
2812 447 1270 1095
AMERICAN
INDIAN
7 1 6 0
ASIAN 1 1 0 0
BLACK 2187 232 860 1095
HISPANIC 25 1 23 1
WHITE 611 213 398 0
OTHER 6 0 6 0
TOT
POP.>18 yr
1665 302 636 727
TOT
POP.<18 yr
1147 145 634 368
TOTAL RESIDENCES 827 167 275 385

D. Health Outcome Data

Government agencies routinely collect data regarding the health of populations within the state. The most recent cancer incidence data from the Louisiana Tumor Registry (LSU Medical Center) was obtained for the years 1983-1990. Cancer incidence data was evaluated (Appendix C). Data for other health effects was also obtained from the Louisiana Office of Vital Statistics for the years 1982-1988. A discussion of the evaluation of health outcome data can be found in the Public Health Implications section.

COMMUNITY HEALTH CONCERNS

Industrial workers and residents of the local communities which surround the PPI site have reported a variety of health concerns to LOPH, ATSDR, EPA, and the National Institute for Occupational Safety and Health (NIOSH).

On November 17 and 18, 1980, a health survey was conducted in the Alsen community, southeast of the PPI Site. A team consisting of one physician, one nurse and two public health investigators were in the community center collecting information from people who came voluntarily for a health interview. Approximately 140 people were interviewed; information was obtained for 107 households representing 367 residents or about 40% of the total population of Alsen. Some of the health complaints included burning eyes, frequent headaches, sinus problems, breathing difficulties, nausea and vomiting, skin rashes and dizziness (Appendix B).

NIOSH conducted a hazard investigation in March of 1988 in response to a request submitted by representatives of the Aluminum, Brick, and Glass Workers International Union. In January of 1991, EPA hosted an Open House meeting for the residents of the communities surrounding PPI. At this meeting the local citizens submitted a list of questions and concerns relating to the site (Appendix D). Health related concerns from this list are included in this section.

The LOPH organized and participated in three meetings (3/12/91, 4/17/91, and 5/29/91) with a group of 14 citizens and representatives designated as the Community Advisory Committee for PPI. The members of this Committee include citizens recognized as community leaders, workers from local industries, the State representative for the district, and concerned citizens from the community. The Community Advisory Committee voiced their concerns and assisted LOPH in organizing a Public Meeting to gather concerns from the whole community. The Public Meeting was held by LOPH on May 14, 1991 with 20 community members attending.

Through NIOSH's hazard investigation, EPA's Open House, the Community Advisory Committee, and the LOPH Public Meeting, the community has raised the following health related concerns:

On February 8, 1994, the Coalition for Community Action, a citizens group near the site, held a meeting and stated a number of additional concerns.

Health concerns are addressed in the Community Health Concerns Evaluation section.

Next Section          Table of Contents


Agency for Toxic Substances and Disease Registry, 1825 Century Blvd, Atlanta, GA 30345
Contact CDC: 800-232-4636 / TTY: 888-232-6348
 
USA.gov: The U.S. Government's Official Web Portal