HEALTH CONSULTATION
SHARON SPEEDWAY
HARTFORD TOWNSHIP, TRUMBULL COUNTY, OHIO
TABLES AND FIGURES
TABLE 1
US EPA ERT SOIL SAMPLING, SHARON SPEEDWAY SITE
| Sampling Location | Number of Sample | Minimum PCB Level (ppm) | Maximum PCB Level (ppm | Mean PCB Level (ppm) |
| Dirt Driveway | 59 | BDL | 43 | 10.64 |
| West Parking Lot | 21 | BDL | 57 | 10.85 |
| South Parking Lot | 9 | 2.9 | 30 | 13.70 |
| Track Area | 14 | BDL | 15 | 2.80 |
| Sediment in stream | 3 | BDL | BDL | BDL |
PCBs = Polychlorinated Biphenols
ppm = Parts per Million
BDL = concentration below detection limit
This figure was unavailable for inclusion at time of electronic publication.
This figure was unavailable for inclusion at time of electronic publication.
This figure was unavailable for inclusion at time of electronic publication.


