APPENDIX G

TABLES OF SIMULATED PROPORTIONATE CONTRIBUTION OF WATER
DERIVED USING THE MANUAL ADJUSTMENT PROCESS,
DOVER TOWNSHIP AREA, NEW JERSEY
1962, 1965, 1971, 1978, 1988, 1995, AND 1996

Table G-1. Simulated proportionate contribution of water from well or well field to selected pipe-line
locations using manual adjustment process, Dover Township area, New Jersey, 1962
[—, well or well field not part of distribution-system network for this year; see Table 18 for correspondence between
pipeline location and model node; see Plate 52 for pipeline location]

Month

Pipeline
location

Water contributed from well or well field (percentage)

Holly

Brookside

South Toms River

Indian Head

Parkway

Route 70

Berkeley

Windsor

Anchorage

Silver Bay

SUM1

A

9

91

100

B

0

0

20

January

C

25

75

100

D

0

100

100

E

0

0

0

 

 

 

 

 

 

 

 

 

 

 

A

0

100

100

B

0

0

0

February

C

8

92

100

D

0

100

100

E

0

0

0

 

 

 

 

 

 

 

 

 

 

 

A

10

90

100

B

0

0

0

March

C

21

79

100

D

0

100

100

E

0

0

0

 

 

 

 

 

 

 

 

 

 

 

A

28

72

100

B

0

0

0

April

C

47

53

100

D

0

100

100

E

0

0

0

 

 

 

 

 

 

 

 

 

 

 

A

23

77

100

B

0

0

0

May

C

72

28

100

D

0

100

100

E

0

0

0

 

 

 

 

 

 

 

 

 

 

 

A

27

73

100

B

0

0

0

June

C

80

20

100

D

0

100

100

E

0

0

0

 

 

 

 

 

 

 

 

 

 

 

A

24

76

100

B

0

0

0

July

C

78

22

100

D

0

100

100

E

0

0

0

 

 

 

 

 

 

 

 

 

 

 

 

 

A

31

69

100

B

0

0

0

August

C

62

38

100

D

0

100

100

E

0

0

0

 

 

 

 

 

 

 

 

 

 

 

 

 

A

33

67

100

B

0

0

0

September

C

84

16

100

D

0

100

100

E

0

0

0

 

 

 

 

 

 

 

 

 

 

 

 

 

A

41

59

100

B

0

0

0

October

C

72

28

100

D

1

99

100

E

0

0

0

 

 

 

 

 

 

 

 

 

 

 

 

 

A

26

74

100

B

0

0

0

November

C

44

56

100

D

0

100

100

E

0

0

0

 

 

 

 

 

 

 

 

 

 

 

 

 

A

26

74

100

B

0

0

0

December

C

47

53

100

D

0

100

100

E

0

0

0

1 SUM: sum of percentages across row for each location.
2 A sum of 0% indicates node was not part of water distribution-system for this month and year.

Table G-2. Simulated proportionate contribution of water from well or well field to selected pipe-line
locations using manual adjustment process, Dover Township area, New Jersey, 1965
[—, well or well field not part of distribution-system network for this year; see Table 18 for correspondence between
pipeline location and model node; see Plate 58 for pipeline location]

Month

Pipeline
location

Water contributed from well or well field (percentage)

Holly

Brookside

South Toms River

Indian Head

Parkway

Route 70

Berkeley

Windsor

Anchorage

Silver Bay

SUM1

A

54

46

100

B

91

9

100

January

C

47

53

100

D

0

100

100

E

0

100

100

 

 

 

 

 

 

 

 

 

 

 

 

 

A

56

44

100

B

83

17

100

February3

C

39

61

100

D

0

100

100

E

0

100

100

 

 

 

 

 

 

 

 

 

 

 

 

 

A

56

44

100

B

86

14

100

March

C

43

57

100

D

0

100

100

E

0

100

100

 

 

 

 

 

 

 

 

 

 

 

 

 

A

89

11

100

B

99

1

100

April

C

72

28

100

D

6

94

100

E

3

97

100

 

 

 

 

 

 

 

 

 

 

 

 

 

A

98

2

100

B

100

0

100

May

C

78

22

100

D

20

80

100

E

0

100

100

 

 

 

 

 

 

 

 

 

 

 

 

 

A

98

2

100

B

100

0

100

June

C

80

20

100

D

20

80

100

E

0

100

100

 

 

 

 

 

 

 

 

 

 

 

 

 

A

98

2

100

B

100

0

100

July

C

78

22

100

D

21

79

100

E

0

100

100

 

 

 

 

 

 

 

 

 

 

 

 

 

A

99

1

100

B

100

0

100

August

C

82

18

100

D

22

78

100

E

0

100

100

 

 

 

 

 

 

 

 

 

 

 

 

 

A

97

3

100

B

100

0

100

September

C

72

28

100

D

21

79

100

E

1

99

100

 

 

 

 

 

 

 

 

 

 

 

 

 

A

87

13

100

B

100

0

100

October

C

72

28

100

D

6

94

100

E

0

100

100

 

 

 

 

 

 

 

 

 

 

 

 

 

A

73

27

100

B

92

8

100

November

C

37

63

100

D

0

100

100

E

0

100

100

 

 

 

 

 

 

 

 

 

 

 

 

 

A

59

41

100

B

89

11

100

December

C

38

62

100

D

0

100

100

E

0

100

100

1 SUM: sum of percentages across row for each location.

Table G-3. Simulated proportionate contribution of water from well or well field to selected pipe-line
locations using manual adjustment process, Dover Township area, New Jersey, 1971
[—, well or well field not part of distribution-system network for this year; see Table 18 for correspondence between
pipeline location and model node; see Plate 64 for pipeline location]

Month

Pipeline
location

Water contributed from well or well field (percentage)

Holly

Brookside

South Toms River

Indian Head

Parkway

Route 70

Berkeley

Windsor

Anchorage

Silver Bay

SUM1

A

93

0

7

0

0

0

0

100

B

100

0

0

0

0

0

0

100

January

C

4

0

0

96

0

0

0

100

D

26

73

1

0

0

0

0

100

E

32

62

0

6

0

0

0

100

     

A

85

0

15

0

0

0

0

100

B

100

0

0

0

0

0

0

100

February

C

4

0

0

96

0

0

0

100

D

46

44

2

8

0

0

0

100

E

24

34

0

42

0

0

0

100

     

A

83

0

17

0

0

0

0

100

B

100

0

0

0

0

0

0

100

March

C

4

0

0

96

0

0

0

100

D

37

60

2

1

0

0

0

100

E

36

54

1

9

0

0

0

100

     

A

84

0

16

0

0

0

0

100

B

100

0

0

0

0

0

0

100

April

C

4

0

0

96

0

0

0

100

D

41

54

1

3

0

0

0

99

E

29

49

0

20

0

1

2

101

     

A

89

0

11

0

0

0

0

100

B

100

0

0

0

0

0

0

100

May

C

4

0

0

96

0

0

0

100

D

43

54

2

1

0

0

0

100

E

22

24

0

18

0

1

35

100

     

A

88

0

12

0

0

0

0

100

B

100

0

0

0

0

0

0

100

June

C

4

0

0

96

0

0

0

100

D

44

52

3

1

1

0

0

101

E

24

9

0

16

7

12

33

101

     

A

97

0

3

0

0

0

0

100

B

100

0

0

0

0

0

0

100

July

C

0

0

0

96

4

0

0

100

D

30

54

0

3

14

0

0

101

E

3

4

0

5

24

24

40

100

     

A

100

0

0

0

0

0

0

100

B

100

0

0

0

0

0

0

100

August

C

0

0

0

96

4

0

0

100

D

39

61

0

0

1

0

0

101

E

2

2

0

2

14

27

53

100

     

A

99

0

1

0

0

0

0

100

B

100

0

0

0

0

0

0

100

September

C

0

0

0

96

4

0

0

100

D

18

75

0

2

6

0

0

101

E

1

8

0

1

3

19

69

101

     

A

100

0

0

0

0

0

0

100

B

100

0

0

0

0

0

0

100

October

C

4

0

0

96

0

0

0

100

D

19

80

0

1

0

0

0

100

E

0

2

0

0

0

21

77

100

     

A

99

0

1

0

0

0

0

100

B

100

0

0

0

0

0

0

100

November

C

2

0

0

98

0

0

0

100

D

14

83

0

3

0

0

0

100

E

4

50

0

15

0

9

22

100

     

A

100

0

0

0

0

0

0

100

B

100

0

0

0

0

0

0

100

December

C

4

0

0

96

0

0

0

100

D

27

72

0

1

0

0

0

100

E

15

49

0

36

0

0

0

100

1 SUM: sum of percentages across row for each location.

Table G-4. Simulated proportionate contribution of water from well or well field to selected pipe-line
locations using manual adjustment process, Dover Township area, New Jersey, 1978
[—, well or well field not part of distribution-system network for this year; see Table 18 for correspondence between
pipeline location and model node; see Plate 83 for pipeline location]

Month

Pipeline
location

Water contributed from well or well field (percentage)

Holly

Brookside

South Toms River

Indian Head

Parkway

Route 70

Berkeley

Windsor

Anchorage

Silver Bay

SUM1

A

88

0

12

0

0

0

0

100

B

20

0

0

50

30

0

0

100

January

C

0

0

0

34

66

0

0

100

D

70

0

3

3

23

0

0

99

E

11

0

1

10

79

0

0

101

     

A

84

0

15

0

0

0

0

99

B

10

0

0

53

36

0

0

99

February

C

0

0

0

30

70

0

0

100

D

55

0

3

4

39

0

0

101

E

6

0

0

9

85

0

0

100

     

A

74

0

20

1

5

0

0

100

B

8

0

0

53

39

0

0

100

March

C

0

0

0

27

73

0

0

100

D

50

0

4

4

43

0

0

101

E

5

0

0

8

86

0

0

99

     

A

76

0

24

0

0

0

0

100

B

18

0

0

38

44

0

0

100

April

C

0

0

0

16

84

0

0

100

D

44

22

7

2

26

0

0

101

E

2

8

0

2

31

39

17

99

     

A

75

0

25

0

0

0

0

100

B

14

0

0

54

32

0

0

100

May

C

0

0

0

10

90

0

0

100

D

34

30

6

1

28

0

0

99

E

2

15

0

2

35

28

17

99

     

A

81

0

19

0

0

0

0

100

B

14

0

0

43

44

0

0

101

June

C

0

0

0

2

98

0

0

100

D

25

42

4

0

30

0

0

101

E

0

4

0

0

25

29

41

99

     

A

82

0

18

0

0

0

0

100

B

15

0

0

40

45

0

0

100

July

C

0

0

0

0

100

0

0

100

D

23

46

3

0

28

0

0

100

E

1

7

0

0

27

31

34

100

     

A

84

0

14

0

2

0

0

100

B

16

0

0

46

38

0

0

100

August

C

0

0

0

13

87

0

0

100

D

18

59

4

0

19

0

0

100

E

0

4

0

0

19

29

47

99

     

A

84

0

16

0

0

0

0

100

B

18

0

0

48

34

0

0

100

September

C

0

0

0

23

77

0

0

100

D

25

48

4

0

23

0

0

100

E

1

11

0

0

28

30

31

101

     

A

85

0

15

0

0

0

0

100

B

25

0

0

48

27

0

0

100

October

C

0

0

0

18

82

0

0

100

D

40

48

2

1

9

0

0

100

E

8

25

0

4

63

0

0

100

     

A

98

0

2

0

0

0

0

100

B

17

0

0

47

36

0

0

100

November

C

0

0

0

29

71

0

0

100

D

56

10

0

2

31

0

0

99

E

8

7

0

6

79

0

0

100

     

A

84

0

12

0

4

0

0

100

B

19

0

0

0

81

0

0

100

December

C

0

0

0

0

100

0

0

100

D

56

0

3

0

41

0

0

100

E

7

0

0

0

92

0

0

99

1 SUM: sum of percentages across row for each location.

Table G-5. Simulated proportionate contribution of water from well or well field to selected pipe-line
locations using manual adjustment process, Dover Township area, New Jersey, 1988
[—, well or well field not part of distribution-system network for this year; see Table 18 for correspondence between
pipeline location and model node; see Plate 99 for pipeline location]

Month

Pipeline
location

Water contributed from well or well field (percentage)

Holly

Brookside

South Toms River

Indian Head

Parkway

Route 70

Berkeley

Windsor

Anchorage

Silver Bay

SUM1

A

79

0

20

0

0

0

1

100

B

0

0

0

0

0

0

100

100

January

C

11

0

0

0

53

12

24

100

D

40

54

1

0

4

0

1

100

E

5

8

0

0

36

47

4

100

     

A

69

0

29

0

0

0

2

100

B

0

0

0

0

0

0

100

100

February

C

3

0

0

0

27

3

66

99

D

74

6

4

0

11

0

5

100

E

7

1

0

0

24

50

17

99

     

A

58

0

31

0

0

0

11

100

B

0

0

0

0

0

0

100

100

March

C

0

0

0

0

29

2

69

100

D

44

35

2

0

6

1

12

100

E

2

4

0

0

31

49

14

100

     

A

79

0

16

0

0

0

5

100

B

0

0

0

0

0

0

100

100

April

C

0

0

0

0

43

1

57

101

D

41

47

1

0

8

0

3

100

E

2

6

0

0

37

45

10

100

     

A

84

0

13

0

0

0

3

100

B

0

0

0

0

0

0

100

100

May

C

1

0

0

0

54

1

44

100

D

56

36

1

0

6

0

1

100

E

3

6

0

0

42

41

8

100

     

A

50

0

48

0

0

0

3

101

B

15

0

0

1

1

0

83

100

June

C

9

0

0

4

80

0

7

100

D

46

30

7

0

15

0

1

99

E

5

5

0

5

64

21

1

101

     

A

40

0

60

0

0

0

0

100

B

8

0

0

0

0

0

91

99

July

C

25

0

0

4

53

0

18

100

D

49

26

11

0

14

0

1

101

E

6

3

0

15

57

16

2

99

     

A

52

0

47

0

0

0

1

100

B

49

0

0

1

4

0

47

101

August

C

6

0

0

14

80

0

0

100

D

45

32

9

1

13

0

0

100

E

4

4

0

15

58

19

0

100

     

A

74

0

19

0

0

0

7

100

B

1

0

0

0

0

0

99

100

September

C

0

0

0

31

69

0

0

100

D

24

25

0

5

43

0

3

100

E

0

1

0

25

44

30

0

100

     

A

77

0

15

1

1

0

6

100

B

0

0

0

22

31

0

46

99

October

C

0

0

0

21

79

0

0

100

D

22

0

0

8

69

0

1

100

E

0

0

0

18

43

39

0

100

     

A

58

0

28

0

0

0

14

100

B

0

0

0

0

0

0

100

100

November

C

0

0

0

54

27

2

17

100

D

30

32

1

10

17

1

9

100

E

1

2

0

25

22

47

3

100

     

A

0

0

17

2

13

0

68

100

B

0

0

0

0

0

0

100

100

December

C

0

0

0

15

71

13

0

99

D

0

0

0

4

90

1

5

100

E

0

0

0

4

47

48

0

99

1 SUM: sum of percentages across row for each location.

Table G-6. Simulated proportionate contribution of water from well or well field to selected pipe-line
locations using manual adjustment process, Dover Township area, New Jersey, 1995
[—, well or well field not part of distribution-system network for this year; see Table 18 for correspondence between
pipeline location and model node; see Plate 118 for pipeline location]

Month

Pipeline
location

Water contributed from well or well field (percentage)

Holly

Brookside

South Toms River

Indian Head

Parkway

Route 70

Berkeley

Windsor

Anchorage

Silver Bay

SUM1

A

0

0

90

0

0

0

10

0

100

B

0

0

0

0

0

0

100

0

100

January

C

0

0

0

8

82

0

10

0

100

D

0

0

3

3

74

0

20

0

100

E

0

0

0

27

44

23

6

0

100

   

A

0

0

55

0

0

0

45

0

100

B

0

0

0

0

0

0

100

0

100

February

C

0

0

0

12

88

0

0

0

100

D

0

0

1

4

83

0

11

0

99

E

0

0

0

29

43

27

0

0

99

   

A

0

0

5

2

24

0

69

0

100

B

0

0

0

0

0

0

100

0

100

March

C

0

0

0

11

87

0

1

0

99

D

0

0

0

7

90

0

3

0

100

E

0

0

0

28

43

29

1

0

101

   

A

7

0

75

0

0

0

18

0

100

B

0

0

0

0

0

0

100

0

100

April

C

0

0

0

3

86

0

11

0

100

D

9

0

3

2

67

0

18

0

99

E

0

0

0

22

55

21

2

0

100

   

A

32

0

63

0

0

0

4

0

99

B

0

0

0

1

1

0

98

0

100

May

C

0

0

0

0

86

0

14

0

100

D

42

0

5

0

44

0

8

0

99

E

0

0

0

18

58

20

3

0

99

   

A

54

0

42

0

0

0

4

0

100

B

22

0

0

0

1

0

77

0

100

June

C

2

0

0

0

94

0

4

0

100

D

73

2

4

0

18

0

4

0

101

E

2

0

0

14

73

9

1

0

99

   

A

27

0

71

0

0

0

2

0

100

B

41

0

0

0

6

0

53

0

100

July

C

18

0

0

0

79

0

2

0

99

D

73

6

9

0

10

0

1

0

99

E

7

1

0

13

71

9

1

0

102

   

A

24

0

76

0

0

0

0

0

100

B

59

0

0

1

17

0

24

0

101

August

C

12

0

0

1

87

0

0

0

100

D

55

12

23

0

2

0

0

7

99

E

11

7

1

5

69

6

0

1

100

   

A

54

0

40

0

0

0

6

0

100

B

27

0

0

1

0

0

72

0

100

September

C

14

0

0

3

77

0

6

0

100

D

66

18

4

0

9

0

4

0

101

E

4

1

0

14

70

9

1

0

99

   

A

66

0

0

0

0

0

34

0

100

B

0

0

0

0

0

0

100

0

100

October

C

0

0

0

4

79

0

17

0

100

D

29

0

0

2

50

0

19

0

100

E

9

0

0

22

54

20

5

0

101

   

A

0

0

0

1

16

0

83

0

100

B

0

0

0

0

0

0

100

0

100

November

C

0

0

0

5

81

0

14

0

100

D

0

0

0

5

81

0

14

0

100

E

0

0

0

32

38

24

7

0

101

   

A

0

0

0

1

12

0

87

0

100

B

0

0

0

0

0

0

100

0

100

December

C

0

0

0

6

77

0

17

0

100

D

0

0

0

6

82

0

12

0

100

E

0

0

0

28

36

26

10

0

100

1 SUM: sum of percentages across row for each location.

Table G-7. Simulated proportionate contribution of water from well or well field to selected pipe-line
locations using manual adjustment process, Dover Township area, New Jersey, 1996
[—, well or well field not part of distribution-system network for this year; see Table 18 for correspondence between
pipeline location and model node; see Plate 137 for pipeline location]

Month

Pipeline
location

Water contributed from well or well field (percentage)

Holly

Brookside

South Toms River

Indian Head

Parkway

Route 70

Berkeley

Windsor

Anchorage

Silver Bay

SUM1

A

0

0

12

0

8

0

79

0

99

B

0

0

0

0

0

0

100

0

100

January

C

0

0

0

7

79

0

14

0

100

D

0

0

0

4

74

0

21

0

99

E

0

0

0

22

46

27

5

0

100

   

A

0

0

16

4

48

0

31

0

99

B

0

0

0

2

19

0

79

0

100

February

C

0

0

0

8

92

0

0

0

100

D

0

0

2

6

89

0

3

0

100

E

0

0

0

28

48

24

0

0

100

   

A

26

0

26

0

25

0

22

0

99

B

0

0

0

1

20

0

80

0

101

March

C

0

0

0

11

88

0

0

0

99

D

10

0

2

4

79

0

5

0

100

E

0

0

0

24

51

24

0

0

99

   

A

48

0

52

0

0

0

0

0

100

B

38

0

0

0

0

0

61

0

99

April

C

13

0

0

0

85

0

1

0

99

D

85

0

6

0

8

0

1

0

100

E

4

0

0

4

91

0

0

0

99

   

A

64

0

35

0

0

0

0

0

99

B

56

0

0

0

8

0

36

0

100

May

C

20

0

0

0

80

0

0

0

100

D

80

7

6

0

7

0

0

0

100

E

8

2

0

0

89

0

0

0

99

   

A

68

0

27

0

0

0

5

0

100

B

36

0

0

0

2

0

62

0

100

June

C

19

0

0

0

74

0

7

0

100

D

66

2

9

0

2

0

4

17

100

E

13

2

1

0

74

5

2

3

100

   

A

35

0

65

0

0

0

0

0

100

B

10

0

0

0

0

0

90

0

100

July

C

17

0

0

0

69

0

14

0

100

D

80

0

15

0

3

0

1

0

99

E

12

0

1

6

70

7

4

1

101

   

A

40

0

60

0

0

0

0

0

100

B

20

0

0

0

0

0

80

0

100

August

C

20

0

0

0

65

0

14

0

99

D

66

0

14

0

1

0

1

18

100

E

17

0

1

0

68

7

5

3

101

   

A

23

0

76

0

0

0

1

0

100

B

0

0

0

0

3

0

97

0

100

September

C

2

0

0

0

71

0

27

0

100

D

67

0

13

0

14

0

6

0

100

E

4

0

0

0

77

10

9

0

100

   

A

7

0

83

0

0

0

11

0

101

B

0

0

0

0

0

0

100

0

100

October

C

0

0

0

0

92

0

8

0

100

D

9

0

6

0

65

0

20

0

100

E

0

0

0

0

76

20

4

0

100

   

A

48

0

33

0

0

0

19

0

100

B

0

0

0

0

0

0

100

0

100

November

C

0

0

0

0

49

0

51

0

100

D

56

0

6

0

2

0

16

21

101

E

5

0

0

0

59

18

13

5

100

   

A

96

0

0

0

0

0

4

0

100

B

3

0

0

0

0

0

97

0

100

December

C

30

0

0

0

0

0

70

0

100

D

1

0

0

0

0

0

0

99

100

E

33

0

0

0

0

23

13

30

99

1 SUM: sum of percentages across row for each location.